Consent-free granny flats: what builders need to know about the 70 m² exemption
Since 15 January 2026, a small standalone dwelling of up to 70 square metres can be built in New Zealand without a building consent. For builders this is a real opening, but it is not a free-for-all. The exemption comes with its own paperwork, and the responsibility for getting it right sits with you and your client.
What qualifies
Under the guidance published by MBIE's Building Performance team, the exemption covers a new, standalone, single-storey dwelling with a floor area of 70 m² or less. It has to be wholly new work, not an addition or alteration to an existing building, and it still has to meet the Building Code. The exemption sits in Schedule 1A of the Building Act 2004.
Licensed building practitioners are required
The work must be carried out or supervised by licensed building practitioners. Homeowners stay legally responsible for Building Code and exemption compliance, so a client who simply hands you a sketch and a budget is still carrying the risk. Make sure they know that.
The council still has a role
No building consent does not mean no council involvement:
- Before you start: the homeowner needs a project information memorandum (PIM) from the council. Infrastructure charges still apply and are charged through the PIM process.
- After you finish: the council has to be notified, with documentation lodged within 20 working days of completion. The licensed building practitioner provides the Record of Work to both the homeowner and the council.
- Timeframe: the work should be completed within two years of the PIM being issued, or an extension applied for.
Councils do not inspect or approve exempt work, which is exactly why your own quality control and records matter more, not less.
Resource consent is a separate question
The building consent exemption does not decide whether you need a resource consent. Zoning, site constraints and the national rules for minor residential units are assessed separately, and some sites will still need a building consent, a resource consent, or both. Check the site before you quote.
A practical checklist before you price one
- Confirm the design is a simple, new, single-storey, standalone dwelling of 70 m² or less.
- Confirm who the licensed building practitioners are for design and construction.
- Get the PIM before work starts and note the two-year window.
- Check resource consent and infrastructure charges for the site.
- Diarise the 20 working day notification and the Record of Work.
- Put the client's responsibilities in writing in your contract.
Rules like this are still being refined, and the Government has signalled further changes. Check the official guidance before each job rather than relying on last quarter's summary.
General information only, not legal advice. Source: MBIE Building Performance, granny flats exemption guidance.